EVM Elite EnSave Pro External SSD 512GB
SKU: EnSave512G_HSN:84717020
₹9,550
On Sale
MRP. ₹14,000 Save 32%
Price incl. GST (18%) ₹1,456.78
We always sell new latest manufacturing and genuine sealed pack products.
1
Call or WhatsApp us if you have any questions.
Brand: EVM
Generic Name: SSD
Product: New
Model: EnSave
Capacity: 512GB
Warranty: 10 YEAR WARRANTY
Volumetric Weight: 0.50 kg
About this item
- Ultra-Compact Design: Measuring just 5.7mm in thickness, its sleek and compact design sets a new standard for portability, making it the perfect companion for your on-the-go lifestyle
| Digital Storage Capacity | 512 GB |
| Hard Disk Interface | Solid State |
| Connectivity Technology | USB |
| Brand | EVM |
| Special Feature | Portable, Drop Resistence, Compact Size |
| Hard Disk Form Factor | 2.5 Centimetres |
| Hard Disk Description | Solid State Drive |
| Compatible Devices | Desktop |
| Installation Type | External Hard Drive |
| Colour | Up to 2000Mb/s (EnSave Pro) |

Technical Details
| Brand | EVM |
|---|---|
| Manufacturer | EVM, EVM INDIA,3F/4F Technology Building,B Block XiXiang Baoan District Shenzhen |
| Series | 512 GB |
| Colour | Up to 2000Mb/s (EnSave Pro) |
| Form Factor | Portable |
| Item Height | 12 Centimeters |
| Item Width | 12 Centimeters |
| Product Dimensions | 12 x 12 x 12 cm; 250 Grams |
| Item model number | 512 GB |
| Hard Drive Size | 512 GB |
| Hard Disk Description | Solid State Drive |
| Hard Drive Interface | Solid State |
| Hard Disk Rotational Speed | 2000 RPM |
Porter & Borzo (Wefast) Now Available
EVM Elite EnSave Pro External SSD 512GB
Display prices in:INR






