EVM 2TB Internal SSD - M.2 NVMe PCIe (2280)

SKU: EVM2TB_HSN:85235100
₹10,800
On Sale
MRP. ₹20,000 Save 46%
Price incl. GST (18%) ₹1,647.46
We always sell new latest manufacturing and genuine sealed pack products.
1
Order Quantity : from 1 to 2 qty
Call or WhatsApp us if you have any questions.
Brand: EVM
Generic Name: SATA SSD
Product: New
Model: 2280
Capacity: 2TB
Warranty: 5 YEAR WARRANTY
Volumetric Weight: 0.10 kg

About this item

  • Capacity 2TB Form Factor M.2 NV Me Interface Pcle Gen 3x4
  • Shock resisitance 1500G/0.5ms MTBF 2,000,000 hours
  • Performance Read (max.) Sequential Read: up to 3500MB/s
  • Performance Write (max) Sequential Write: up to 3050MB/s
  • Storage Temperature -40*C to 85*C
Digital Storage Capacity 2 TB
Hard Disk Interface Solid State
Connectivity Technology SATA
Brand EVM
Special Feature compact
Hard Disk Form Factor 2280 Inches
Hard Disk Description Solid State Drive
Compatible Devices Laptop
Installation Type Internal Hard Drive
Colour Black
Porter & Borzo (Wefast) Now Available
(Free Shipping in Limited Area)
EVM 2TB Internal SSD - M.2 NVMe PCIe (2280)